Construction

Concrete calculator

Calculate rectangular concrete volume with an allowance.

≥ 0
≥ 0
≥ 0
≥ 0

Both a decimal point and a comma work.

3.3

Concrete including allowance

Net volume
3 m³

How it works

V = length × width × depth × (1 + reserve/100)

Using the calculator

Enter: Length · Width · Thickness / depth · Allowance. Calculation: V = length × width × depth × (1 + reserve/100).

Worked input and result

Example: Length = 6 m; Width = 3 m; Thickness / depth = 0.2 m; Allowance = 5 %. Result: Concrete including allowance = 3.78 m³ (Net volume: 3.6 m³).

Understanding the result

Length × width × depth gives m³, then the allowance is added. Enter all dimensions in metres. This material quantity estimate does not determine structural strength or mix design.

Net volume is length × width × depth; the waste percentage is applied afterwards. Use metres consistently, and check whether your supplier rounds orders to whole bags or delivery units.

Language

العربيةARDeutschDEEnglishENEspañolESFrançaisFRעבריתHEहिन्दीHIBahasa IndonesiaIDItalianoIT日本語JA한국어KONederlandsNLPolskiPLPortuguêsPTРусскийRUSlovenščinaSLSvenskaSVTürkçeTRУкраїнськаUK中文ZH